Projects

 
Spring 2015
 
 
Over time bunker edges start to fail, especially when raking with mechanical machines.  These specific repairs are time consuming but worth it in the end for both aesthetics and playability purposes
#12 GRN side bunker
 
#13 GRN side bunker
 
 
Bunker maintenance can be a tedious job but important so players have a fair chance getting out of the hazard and continuing in play 
 
 

 Irrigation supply pipe repair / 2014
 
 
In order to maintain plant health we obviously need a main water supply.  We draw effluent water from the adjacent hospital which is pumped into our holding ponds and eventually used to irrigate the plants on the golf course.  You all have noticed irrigation repairs are a constant battle due to high pressures, faulty purposes, compaction from above ground and age of components.  Some repairs are bigger than others as you can see in these pictures.  30' excavation and hard laboring work had to be done to fix this break.
 

 

 
#11 drainage project / 2014
 
Trenched and laid 10" non-permeable pipe which has permeable pipe and weeping tile tied into it. This was designed to direct drain water from surrounding areas as it is the lowest part of the golf course.
 
Before

After
 
 
Completion #10 and ready for play / 2014
 
 
Bunkers still needed to be edged, base needed to be tamped and playing sand put into place from being shaped last fall
 
 
Hard to see due to poor picture quality but this is Don a long time member and avid golfer. Only fitting to be the first to play newly design hole #10
 
 
 
Club House area Landscape Project / 2014
 
 Face lift on #19 Tee and Club House area with cedar mulch and addition to brick wall
 
#1 Tee Walk way install and rock removal, replaced with cedar mulch
 
 
Superintendent taking the reins
 
 
 
Irrigation installation #5 / 2013
 
Trench is dug
 
Pipe is laid
 
Crew working together
 
Keeping a positive attitude

Boss's in the trenches
 
#10 Re-Design / Fall 2013
 

Before 
Back filling Pond





Preparation for new sod





Lots of hard work 

 
Ready for sod
 
Rolls of Kentucky Bluegrass
 
 
 
 
 
 
Great volunteer support throughout the project
 
 
 
 
 
 
Help from other departments
 
 
Even people as far as the east coast came to help
 
 
 
 
Addition and reshaping of bunkers
 
 

 
All the hard work paid off!
 
 
 2013 Fall Tree Removal
 
Trees have to be removed from time to time for aesthetic and safety purposes
 
#2 Before
#2 After




 2012 Drainage Project
  
 






                                                                        

 
 
 

 